post-template-default,single,single-post,postid-20237,single-format-standard,bridge-core-3.0,qodef-qi--no-touch,qi-addons-for-elementor-1.6.3,qode-page-transition-enabled,ajax_fade,page_not_loaded,,overlapping_content,qode-theme-ver-28.4,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-7.1,vc_responsive,elementor-default,elementor-kit-21820

Project Progress Update (October – December 2019)

ASTA Enterprise Park, Kajang

ASTA Enterprise Park (ASTA), which totals 31 acres, is in the Bukit Angkat area of Kajang and is in a highly accessible location not only for the ready labour pool in neighbouring Bangi, Balakong or Sungai Long, but it is also within easy reach of both the North South Highway or the Silk Highway.

The Klang Valley’s new industrial benchmark is located in an approved industrial zone where factory owners should not have problems applying for operating licenses and obtaining the various local author approvals.

Taisei Lamick (formerly known as Maypak) factory, built on 5 acres is already running its operations from ASTA.

What’s Available

ASTA 51ASTA has 3 other phases made up of the following:

Phase 1 – 18 Type A units are 3-Storey Semi Detached Industry measuring 8,594 sq ft each.

Phase 2 – 7 vacant industrial land plots.
– Earthwork in progress

Phase 3 – 18 Type B units are 3-Storey Semi Detached Industry with Lower Ground Floor measuring 12,404 sq ft to 12,775 sq ft each

There are ample multi-functional spaces to suit all kinds of different businesses from publishing houses, electrical manufacturers, wine importers, packaging companies, etc. The Type B units in Phase 3 have basement levels measuring 5,531 sq ft to 5,903 sq ft which are perfect for storage. All the units have access to the 1.5 ton service lift.

There are enhanced security features which include CCTVS and motion sensors, 24/7 security patrol guards and security boom gates.

If you would like to find out more information about ASTA, please contact 03-6211 3338 or 018-388 6988

Project Progress Update (Oct - Dec)

Dwi@Rimbun Kasia, Nilai

Blocks A & B – reinforced concrete slab works are underway on Levels 1 & 2.

Rimbun Kasia – Central Park

A 2.3 acres central park with generous provision for a lake, fitness and sporting facilities place the focus of activity on the outdoors to encourage healthy green communal living.

Preparations to award the works are currently in progress and the area is cleared ready for commencement of the works.

For more information on Rimbun Kasia, please contact 1800-18-6388 or www.rimbunkasia.com.my

KaMi Mont’ Kiara

Reinforced concrete structural works are in progress at Level 2, Level 3 and Level 4.

For more information on KaMi Mont’ Kiara, please contact +603-6211 3338 / 018-388 6988 or www.KaMiMontKiara.com