CIVIL ENGINEERING WORKS
17717
page-template,page-template-full_width,page-template-full_width-php,page,page-id-17717,bridge-core-3.0,qodef-qi--no-touch,qi-addons-for-elementor-1.8.1,qode-page-transition-enabled,ajax_fade,page_not_loaded,,overlapping_content,qode-theme-ver-28.4,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-7.9,vc_responsive,elementor-default,elementor-kit-21820

CIVIL ENGINEERING WORKS

EARTHWORKS

No.TitleCompletion DateClient
1.Design, Construction and Completion of East Coast Highway Phase 1 from Karak-Kuantan and to the border of Pahang/Terengganu. Sub-Contract for Earthworks, Drainage & Pavement Works at Sri Jaya Interchange (CH110+420 TO CH111+680)
Contract No : MTD/ECE/SC/EW-1E2 (Sri Jaya 04.001)
Dec 2006MTD Construction Sdn Bhd
2.Site Preparation and Earthworks for Residential Development on Lot 21756, Jalan Mont’ Kiara, Mukim of Batu, Kuala Lumpur for Regalmont Sdn Bhd.October 2003Regalmont Sdn Bhd
3.Design, Construction and Completion of East Coast Highway Phase 1 from Karak – Kuantan and to the Border of Pahang / Terengganu – Sub-contract for Earthworks and Drainage Works. Package 1B2 & 1C1 (CH50+000 to CH51+340)March 2003MTD Construction Sdn Bhd
4.The Construction and Completion of Site Clearance and Earthworks to Phase 2 of the Mixed Housing Development at Lot PTD 9825, Mukim Tanjung 12, Daerah Kuala Langat, Selangor Darul Ehsan.August 2000M/S Mulpha PPNS Sdn Bhd
5.Kuala Lumpur International Airport, Sepang. Southern Support Area Earthworks EW7. Contract No. : KLIA/D/EW7/100/95January 1997KLIA Berhad
6.Kuala Lumpur International Airport Berhad. Bulk Earthworks Contract EW6. Contract No. KLIA/D/EW6/007/94January 1996KLIA Berhad, Tingkat 11 & 12
7.Site Clearing, Earthworks, Erosion Control, Rock Excavation, Turfing and Cover Crops for Sime UEP Industrial Park.October 1994Sime UEP Development S/B
8.Construction of Earthworks for Stage 3 (Package 1)August 1990Sime UEP Development S/B
9.Earthworks on Lot 1521, Mukim Cheras, Daerah Ulu Langat, Selangor.June 1986Pembinaan Sri Jati Sdn Bhd
10.The Clearing of Site, all Earthworks including Excavation, Turfing and Surface Drainage for Central Supply Depot (Sg Buloh) JKR/PER/IP/T/419/80December 1983Government of Malaysia
11.Kuala Lumpur / Petaling Jaya Traffic Dispersal Scheme Contract No.3 & 4October 1981Government of Malaysia (JKR)

ROADS, BRIDGES & INTERCHANGES

No.TitleCompletion DateClient
1.Kulai-Second Link Expressway Interchange, Iskandar Malaysia, Johor.
Expressway Interchange
October 2011Iskandar Regional Development Authority
2.Design, Construction and Completion of East Coast Highway Phase 1 from Karak – Kuantan and to the Border of Pahang / Terengganu. Sub-Contract for Pavement Works – Package 1D-1 to 1G-1. (CH63+000 to CH169+360)July 2004MTD Construction Sdn Bhd
3The Construction and Completion of Interchange to UPSI Campus at Proton City, Tanjong Malim, Perak Darul Ridzuan. Contract Code : INF/1/04AJune 2004Proton City Development Corporation Sdn Bhd
4.The Upgrading of Road through Deferred Payment Scheme: Widening and upgrading of Federal Route 98 from Temerloh to Jerantut, Pahang. July 2003Bina Puri Construction Sdn Bhd
5.Middle Ring Road 2 Package 11. (The Missing Link)September 2001Bumi Hiway (M) Sdn Bhd
6.The Construction and Completion of Earthworks, Roadwork, Drainage, Water Reticulation, Sewerage and Ancillary Works for Zone 2, Subang Bestari Development on Lot PT 32777, Part of PT32779, PT32780 and PT32781, Seksyen U5, Shah Alam, Selangor.November 2001Kumpulan Perangsang Selangor Berhad
7.Construction of Prefabricated Steel Flyover (Autopont) at the Junction of Jalan Masjid Negeri / Jalan Tan Sri Teh Ewe Lim and road widening and drainage along Jalan Masjid Negeri, Penang.January 2000Majlis Perbandaran Pulau Pinang
8.The Construction, Completion and Maintenance of the Kajang By-Pass Road, Hulu Langat district, Selangor D.E.October 1999Lembaga Lebuhraya Malaysia
9.The Upgrading and Widening of Federal Route 1 from Connaught Interchange to Saujana Impian Junction, Section 2 (CH4+550 to CH11+720) Contract No.GSSB/S2/ML/C002/96December 1998Grand Saga Sdn Bhd
10.Replacement of Railway Bridge No. 45/7, Laluan 58, Bidor, Batang Padang, Perak Darul Ridzuan. March 1998The Government of Malaysia
11.Middle Ring Road II Project, Package 7. Jalan Ampang to Jalan Kampung Pandan.April 1997The Government of Malaysia
12.Lembah Beringin Interchange for the Development of Lembah Beringin Mukim Sungai Gumut, daerah Ulu Selangor, Selangor Darul Ehsan.April 1997Lembah Beringin Sdn Bhd
13.Construction and Completion of Overpass and Motorcycle Track, Shah Alam, Selangor.December 1996Guthrie Property Dev Holdings
14.The Construction of Integrated Junction from
Danau Desa, Kuala Lumpur to Lebuhraya
Salak / Seremban, Kuala Lumpur and Fleet Group Sdn Bhd – (Phase II)
August 1996Faber Union Sdn Bhd
15.Sime UEP Industrial Park. Contract No. : SUEP/9207/IP/RW/1.October 1995Sime UEP Dev. Sdn Bhd
16.Design, Construction and Completion of Prefabricated Steel Flyover (Autopont) Over rails and over Jalan Tun Perak at Jalan Tun Abdul Razak, Ipoh, Perak.May 1994Majlis Bandaraya Ipoh
17.North – South Interurban Toll Expressway Ipoh (South) Simpang Pulai. Contract No. : PLUS/8A-1/MC/C63/91anuary 1994Projek Lebuhraya Utara-Selatan Berhad
18.Construction and Completion Interchange Across Salak Expressway. Kuala Lumpur – Seremban Expressway from Taman Desa, Kuala Lumpur (Phase 1)December 1993Faber Union Sdn Bhd
19.Construction and Completion of Sri Damansara Interchange.October 1993Sri Damansara Sdn Bhd
20.Design, Construction and Completion of Prefabricated Steel Flyover (Autopont) Over rails at Batu Gajah Town, Perak.June 1992Government of Malaysia
21.Tropicana Golf & Country Resort Contract. Package 1A. Construction and Completion of Bridge over NKVE and Ancillary Works.April 1992Tropicana Golf & Country Resort Berhad
22.Tropicana Golf & Country Resort. Construction and Completion of Access Road 1 and Ancillary Works.April 1992Tropicana Golf & Country Resort Berhad
23.North South Interurban Toll Expressway: Yong Peng South Interchange.November 1991Projek Lebuhraya Utara – Selatan Berhad
24.Construction and Completion of Access Bridge and Approach Road to Templer Recreation Park, District of Gombak, Selangor D.E.Construction and Completion of Access Bridge and Approach Road to Templer Recreation Park, District of Gombak, Selangor D.E.Perangsang Resort S/B
Kyowa Kanko Kaihatsu (M)
25.North – South Interurban Expressway: Machap to Simpang Renggam.November 1990Projek Lebuhraya Utara – Selatan Berhad
26.New Klang Valley Expressway – Subang to Damansara. Contract No. PLUS/2A/MC/C288November 1990Projek Lebuhraya Utara – Selatan Berhad
27.Privatisation of Kuala Lumpur Interchanges Project : Upgrading of Jalan CherasSeptember 1990Sykt Teratai KG Sdn Bhd/
Mitsui Construction Co. Ltd.
28.Improvement of Jalan Sitiawan – Kg Kayan (Package II) with ‘Cakar Ayam’ System at Mukim Lekir, Daerah Manjung, Perak Darul Ridzuan.April 1991Government of Malaysia (JKR)
29.The Design, Improvement, Construction, Completion and Maintenance of a Road Over-Rail Bridge and Ancillary Works at Jalan
Assam Kumbang, Taiping, Perak. Contract No. JKR/PERS/IP/JK/107/86
May 1987Government of Malaysia
30.Kuala Lumpur – Seremban Toll Expressway. Construction and Completion of a Bridge and Ancillary Works at km22. LLM/T/17-42PTT/85May 1986Lembaga Lebuhraya Malaysia
31.Kuala Lumpur – Seremban Toll Expressway. The Construction and Completion of the Bangi South Link Road. LLM/T/17-322PTT/84September 1985Lembaga Lebuhraya Malaysia
32.The Construction of Interchange at Bangi South, Nilai & Seremban North.April 1985Lembaga Lebuhraya Malaysia
33.Secondary Roads, Western Johore Agricultural Project, (Phase 1) Package 1 July 1984Government of Malaysia (JKR)
34.Widening and Repairing of Jalan Mahameru and Construction of Road to Panggung Negara. JKR/J/R24/180/2March 1984Government of Malaysia (JKR)
35.Penang Island Traffic Dispersal Scheme Package II, JKR/PERS/IP/5481December 1983Government of Malaysia (JKR)
36.The Construction and Completion of Port Dickson Town By-Pass. JKR/PERS/IP/JR/380/80September 1983Government of Malaysia (JKR)
37.Accelerated Rural Roads Contract Package B, NS. JKR/S/NS/251/80March 1982Government of Malaysia (JKR)
38.Rural Roads Kedah Contract Package No 1October 1981Government of Malaysia (JKR)

RUNWAY

No.TitleCompletion DateClient
1.Kuala Lumpur International Airport, Sepang. Runway, Taxiways and Drainage. Contract No. KLIA/D/RA01/038/95January 1998K.L.I.A. Berhad

PUBLIC UTILITIES

No.TitleCompletion DateClient
1.Design and Construction of a New Centralised Sewerage Treatment Plant for 65,000 PE (on a 2 acres site) and Ancillary Works and Services for the Housing Development on TL 017547170 at Luyang, Kota Kinabalu, Sabah.October 2002Kota Kinabalu City Hall
2.Triang Water Supply Scheme, Package 1. Construction and Completion of Water Treatment Plant and related works at Triang, Bera, Pahang. Contract No. : S/PHG/JBA/IP/DSK/003/99June 2002The Government of Pahang (Director Water Supplies State of Pahang)
3.(i) Kuala Lumpur International Airport,
Sepang. Utilities Package UT01. Contract No.KLIA/D/UT01/049/95

(ii) Operation and Maintenance Services
May 1998 & 2000K.L.I.A. Berhad
4.Construction of 1220 mm OD Water Supply Mains fr Mains from 12th Mile Puchong.August 1992Sime UEP Development Sdn Bhd
5.Malaysia Rural Water Supply Schemes
KF01 – Pasir Dusun / Jeli
KF06 – Kuala Balah
KF07 – Lawar / Batu Melintang
KF09 – Gemang
KF11 – Kuala Tiga
KF01/03 – Dabong / Kemusu / Setong
June 1991Government of Malaysia
6.Water Supply System for Perak Selatan and Hilir Perak. Contract No.5 – Construction of Treatment Works, Pumping Station, River Intakes and Ancillary Works. Contract No. JBA/NEG/PK(IP)/025/1985(P)July 1988State Government of Perak

GOLF COURSE

No.TitleCompletion DateClient
1.Tropicana Golf & Country Resort. Construction and Completion of 18-Hole Golf Course (East Course) including Earthworks to Adjoining Residential Area. (Contract Package No.3)October 1993Tropicana Golf & Country Resort Berhad,

DRAINAGE WORKS

No.TitleCompletion DateClient
1.Construction and Completion of Main Drain M1, M2, M3, M4, M5, M6, M7 and Ancillary Works for Ebor Estate Development. Contract No. : LT/2000/MD1/02July 2002Sime UEP Dev. Sdn Bhd
2.Construction and Completion of Main Drain (A26A2 to Retention Pond No.3) (A16-A17) and Main Road (MR1 & MR3) at Area A08 (Contract No. SDA/INFRA/7)September 1993Sri Damansara Sdn Bhd
3.Extension of Shoreline Protection Works at Kertih, Kemaman, Terengganu Darul Iman.October 1996Ethylene Malaysia Sdn Bhd
4.Construction and Completion of the Coastal Protection Works at Pantai Kundor, Melaka.December 1995The Govt of Malaysia (Jabatan Pengairan dan Saliran Malaysia)

TIN MINE WORKS

No.TitleCompletion DateClient
1.Contract for Advance Pre-Stripping Paddock Associated Works (KLM/1/89)March 1992Kuala Langat Mining S/B
2.Dry Stripping for Petaling Tin BerhadDecember 1991Petaling Tin Berhad
3.Dry StrippingFebruary 1990Imuda Sdn Bhd
4.Dry StrippingSeptember 1988The Sungai Besi Mines (M) Bhd
5.Dry StrippingMarch 1988Petaling Tin Berhad
6.Dry StrippingMarch 1983Petaling Tin Berhad
7.Dry StrippingMay 1986The Sungai Besi Mines (M) Bhd
8.Dry StrippingDecember 1984Ayer Hitam Tin Dredging Bhd
9.Dry StrippingDecember 1981Berjuntai Tin Dredging Bhd